
Choose a method for the site
Installation methods vary depending on span, structural form, site conditions and lifting equipment.
Evaluate the assembly sequence
Ground assembly, high-altitude assembly, block lifting and overall lifting are possible methods to evaluate. No single approach is suitable for every structure.
Coordinate temporary works
Temporary support, lifting points and the installation sequence require project-specific engineering review and clear responsibilities.
Work with the local team
Site technical support and construction coordination can be discussed with owners, contractors and local installation teams. Availability and scope are confirmed per project.