Engineering · Fabrication · Installation Support29@29gs.com
NTSSGROUPSPACE FRAME · STEEL STRUCTUREDiscuss Your Project
NTSSGROUP / Built around the building.

Airport & Transportation Hub

Passenger circulation and architectural roof geometry.

Airport & Transportation Hub

Project requirements

Passenger circulation and architectural roof geometry. Share the location, building dimensions, preliminary drawings and intended operation.

Structural challenge

The concept review should consider complex roof forms, movement joints and working above active areas. These are planning topics, not project-specific design conclusions.

Recommended starting point

A space structure system may be considered, subject to layout, loads, support conditions and local project requirements. Alternative systems can be compared during concept review.

Design and fabrication

Agree the design basis and load information before finalizing geometry. Coordinate connection details, inspection requirements and transport dimensions with the manufacturing and project delivery network.

Installation considerations

Confirm site access, lifting equipment, available assembly space and construction sequence. Temporary stability and support removal require an agreed installation plan.

Related structural solutions · Verified project portfolio

LET’S TALK STRUCTURES

Discuss your project.

Tell us what you are planning. We will start with the requirements.

Contact NTSSGROUP
Call usProject Inquiry ↗