Project fit
Two connected structural layers form a spatial load-resisting grid. Depth and support layout should be developed alongside the roof requirements.
Engineering and connection review
The project review should address grid depth, support layout, member utilization and roof services. Final design criteria, loads and applicable standards must be agreed with the responsible project engineer.
Fabrication and delivery
Drawings, materials, member marks, inspection requirements and packing sequence are coordinated through the manufacturing and project delivery network. Ownership of facilities is not implied.
Installation planning
Assembly and lifting methods depend on structural form, site access, temporary supports and available equipment. The construction sequence needs project-specific review.