Project fit
Factory building coordination starts with production requirements and the proposed construction stages.
Engineering and connection review
The project review should address production layout, service routes and phased construction. Final design criteria, loads and applicable standards must be agreed with the responsible project engineer.
Fabrication and delivery
Drawings, materials, member marks, inspection requirements and packing sequence are coordinated through the manufacturing and project delivery network. Ownership of facilities is not implied.
Installation planning
Assembly and lifting methods depend on structural form, site access, temporary supports and available equipment. The construction sequence needs project-specific review.