
Project fit
Workshop structures must account for process layouts and any confirmed crane or machinery loads.
Engineering and connection review
The project review should address crane duties, vibration-sensitive equipment and ventilation openings. Final design criteria, loads and applicable standards must be agreed with the responsible project engineer.
Fabrication and delivery
Drawings, materials, member marks, inspection requirements and packing sequence are coordinated through the manufacturing and project delivery network. Ownership of facilities is not implied.
Installation planning
Assembly and lifting methods depend on structural form, site access, temporary supports and available equipment. The construction sequence needs project-specific review.